Skip to main content

Three bridges to be replaced in Nuremburg

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.
July 22, 2014 Read time: 1 min

In the southern German city of Nuremburg plans are being made for work to replace three old concrete bridges. A feasibility study into the proposed work will now be carried out. The three pre-stressed concrete bridges will have to be demolished and replaced with new structures. In all, the work is expected to cost some €100 million.

Related Content

  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Kenya key bridge project
    April 22, 2021
    Kenya’s key bridge project is going ahead.
  • US$242 million for Cape Fear bridge replacement
    July 26, 2024
    US$242 million is being secured for the Cape Fear bridge replacement.