Skip to main content

A thousand birthday greetings for US-Canada Thousand Island Bridge

The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
August 21, 2018 Read time: 2 mins
The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters.


The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montreal and Toronto, ending in Windsor on the Ontario border with the US state of Michigan.

The 1,370m crossing over the American channel of the river - from the US mainland to Wellesley Island - consists of a suspension bridge with a main span of around 245m and nearly 46m of clearance above the river.

The Canadian crossing includes the 183m continuous Warren Truss span connecting Hill Island to Constance Island, a steel arch of 106m spans from Constance Island to Georgina Island and a suspension bridge of 229m from Georgina Island to the Canadian mainland. The Canadian span from abutment to abutment is 1,015m and the suspension span provides 37m of river clearance.

The boundary at the International Rift boundary – the channel between Wellesley Island and Hill Island - is bridged by two parallel 27.4m rigid-frame arched spans of reinforced concrete with masonry facing. Originally there was only one bridge at boundary but due to increased traffic it was twinned in 1959.

Operation of the Thousand Islands Bridge system is shared under a joint agreement that created the US based Thousand Islands Bridge Authority which estimates that there are 2,000 vehicle-cross the annually. The system’s original consulting engineer was Robinson and Steinman of New York City that  continues to do so today but as 3220 Parsons Transportation, notes the authority.

For more information on companies in this article

Related Content

  • Interstate bridge collapse in Washington State
    May 24, 2013
    A section of bridge carrying Interstate 5 over the Skagit River in the US has collapsed, dumping a number of vehicles into the river, although no fatalities have been reported. The four lane highway bridge lies around 100km north of Seattle in the Pacific North Western state of Washington and provides a key link with neighbouring Canada. The collapse means that traffic between the US and Canada has been disrupted until repairs can be made or a temporary replacement put in place. There is another bridge runn
  • San Francisco’s Bay Bridge eastern span S Curve bows out
    April 2, 2015
    The S Curve section of the old San Francisco-Oakland Bay Bridge is the latest piece of the iconic cantilever crossing of San Francisco Bay to meet its maker. It has been professionally videoed by San Francisco’s Metropolitan Transportation Commission and is available on the website of the local newspaper Easy Bay Express. A sweeping new Bay Bridge has been built right beside the old crossing which is being dismantled in sections and phases.
  • Telematics could be an area for John Deere and Wirtgen resource sharing
    April 20, 2018
    The gods were smiling on the Wirtgen Group for the company’s Road Technology Days 2018 event. This year it was held in summer-like weather at the recently expanded Voegele plant near Mannheim in Germany. Within days the season dramatically changed from dreary chilly late winter to high temperatures, just in time to bathe the amassed demonstration equipment and the 4,000 guests in summer sunshine. But there won’t be any such dramatic changes within the Wirtgen Group, according to Domenic Ruccolo. After 28
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe