Skip to main content

A thousand birthday greetings for US-Canada Thousand Island Bridge

The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
August 21, 2018 Read time: 2 mins
The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters.


The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montreal and Toronto, ending in Windsor on the Ontario border with the US state of Michigan.

The 1,370m crossing over the American channel of the river - from the US mainland to Wellesley Island - consists of a suspension bridge with a main span of around 245m and nearly 46m of clearance above the river.

The Canadian crossing includes the 183m continuous Warren Truss span connecting Hill Island to Constance Island, a steel arch of 106m spans from Constance Island to Georgina Island and a suspension bridge of 229m from Georgina Island to the Canadian mainland. The Canadian span from abutment to abutment is 1,015m and the suspension span provides 37m of river clearance.

The boundary at the International Rift boundary – the channel between Wellesley Island and Hill Island - is bridged by two parallel 27.4m rigid-frame arched spans of reinforced concrete with masonry facing. Originally there was only one bridge at boundary but due to increased traffic it was twinned in 1959.

Operation of the Thousand Islands Bridge system is shared under a joint agreement that created the US based Thousand Islands Bridge Authority which estimates that there are 2,000 vehicle-cross the annually. The system’s original consulting engineer was Robinson and Steinman of New York City that  continues to do so today but as 3220 Parsons Transportation, notes the authority.

For more information on companies in this article

Related Content

  • IRF GRAA Winners Unveiled at 17th IRF World Meeting 2013
    December 11, 2013
    The winners of the 2013 Global Road Achievement Awards were announced during the 17th IRF World Meeting & Exhibition gala dinner at the Ritz Carlton in Riyadh, Saudi Arabia. More than 800 delegates from around the world attended the ceremony, held on November 13, 2013, which celebrated the most comprehensive and well-attended IRF World Meeting in several decades.
  • Norway’s Blakkesrud Bridge to remain closed
    November 24, 2022
    The wooden bridge, which has undergone inspection, is one of a dozen or so wooden bridges closed after the collapse of the Tretten Bridge in August.
  • Nigerian bridge deal awarded
    January 17, 2023
    A major Nigerian bridge deal has been awarded.
  • 3M and 407 ETR have it taped on a major motorway near Toronto
    August 1, 2019
    Canadian motorway concessionaire 407 ETR, in partnership with 3M Canada, is testing 3M's pavement marking tapes for Advanced Driver Assistance Systems on 2.5km of lanes. The initiative is part of the 407 ETR Living Labs programme of innovation to promote safety and next-generation transportation along the 140km route that opened in 1997 and was extended last year. King's Highway 407 is a tolled 400-series highway in the province of Ontario comprising a privately leased segment and publicly owned segm