Skip to main content

Texas toll road opening in 2018

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.
December 15, 2017 Read time: 1 min

Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers. The project has been managed by the 2363 North Texas Tollway Authority. When the link opens to traffic it is expected to carry around 55,000 vehicles/day but this is expected to rise to 174,000 vehicles/day by 2030 due to growth in the area.

For more information on companies in this article

Related Content

  • Brussels road tunnel project complete
    March 1, 2022
    Construction work is complete on a key Brussels road tunnel project.
  • UK Highways Agency unveils additional spending plans
    April 12, 2013
    In the UKL the Highways Agency has announced plans for an additional 58 schemes intended to boost the economy, reduce congestion and improve safety. These schemes form part of the third, and final, stage of the Highways Agency’s pinch point programme. The 58 schemes represent an investment of €114.6 million (£98 million) and are intended to remove bottlenecks and keep traffic moving on England’s motorways and major A roads. They will be delivered by March 2015 and will bring an estimated €1.64 billion (£1.4
  • Indonesia’s new toll bridge project
    July 24, 2019
    A new tolled bridge link is planned for Indonesia’s East Kalimantan. The tender process is opening for the North Penajam Paser-Balikpapan toll bridge project. Building the bridge is expected to cost in the order of US$1.02 billion. The structure and the road connections needed will be around 7.35km long. Building the bridge will cut journey times between Balikpapan and North Panajam from as much as 120 minutes at present to just 10 minutes when the structure is complete.
  • New northern relief road for Moscow
    August 20, 2015
    New Concession Company to build northern relief road of Moscow Kutuzov Avenue – Eugene Gerden writes New Concession Company has won a tender for the building of the Northern relief road of Kutuzovsky Avenue, a major radial avenue in the Russian capital Moscow. The firm is part of Leader company (one of Russia's largest management companies), owned by Yuri Kovalchuk, a well-known Russian businessman, who is reportedly close to Russia’s president Vladimir Putin. It is planned that the building of the n