Skip to main content

Sunderland’s Northern Spire bridge opens

Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
August 28, 2018 Read time: 2 mins
Aspiring spire: The Northern Spire’s 105m-high central A-frame pylon highlights the Sunderland project

Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather.

The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project.

Work began in May 2015 and the bridge has been built within its allocated €129 million budget.

However, poor weather conditions pushed back the opening of the bridge from this past spring, said Mark Jackson, Sunderland City’s head of infrastructure and transportation. Particularly affected was the painting of the pylon, which needed very still, dry, calm conditions, both for the painting and the use of high-level working platforms required by the painting team.

The 336m-long two-span cable-stayed bridge across the River Wear has four vehicle lanes, as well as dedicated cycle and pedestrian routes. The steel and concrete bridge is part of 2.8km of new road layout.

Steel specialist Victor Buyck spent a year fabricating the pylon at its canal-side yard in Ghent, Belgium. Apart from the 1,550tonnes tonnes of steel, around 550tonnes of concrete went into making the pylon that, because of its size, had to be constructed in the open air. It was barged across the often-treacherous North Sea to Sunderland.

World Highways has been following construction of the project, including the manufacturing, transport and raising of the main pylon.
http://www.worldhighways.com/categories/road-highway-structures/features/sunderlands-new-wear-crossing-takes-shape/

The construction contract was awarded to FVB, an international joint venture set up by Farrans Construction and Victor Buyck Steel Construction. Farrans Construction operates as a building and civil engineering contractor across the UK and Ireland. Victor Buyck, based in Belgium, is one of Europe's major structural steelwork contractors, specialising in steel bridges.

FVB has been supported by its design team led by Buro Happold Engineering and Roughan & O'Donovan. Independent checker has been Ramboll.

Related Content

  • The need to repair and replace the world's bridges
    February 22, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector. All over the world existing highway bridges are in need of repair and replacement, with potentially catastrophic consequences should this need be ignored.
  • Funding road research in Kenya as infrastructure development grows
    August 14, 2017
    The demand for road construction material research and testing services in Kenya is expected to soar. The East African country is going through a construction boom, despite policy and financial challenges facing public institutions overseeing the research and testing operations in the transport industry. “Kenya is going through a construction boom and so is the demand for construction material testing services,” said Juma Ali Madzitsa, Geotechnical Lab Supervisor at SGS Kenya, a subsidiary of Swiss based in
  • CONTROLS reaches 50th anniversary and launches new technology
    August 10, 2018
    Testing equipment specialist CONTROLS Group is celebrating its 50 years of supplying testing technology for the civil engineering industry. Controls was founded in October 1968 by Umberto Granelli who is still operative today. What started as a business pioneering the development of compression machines has developed into a leader in testing equipment for the Construction Industry. Pasquale Di Iorio, CONTROLS Group’s president and shareholder and CEO from 1996 to 2017 said, “We want to mark this 50th Anni
  • The use of concrete cutting tools and tips for users
    October 8, 2015
    Despite the proven importance of identifying metal targets and electrical lines before cutting into concrete, every day there are stories about mishaps that happen when the necessary reconnaissance is not done. In this article, a few firms that provide concrete scanning services weigh in on the critical importance of locating embedded and or buried obstructions by scanning for these features using ground penetrating radar (GPR). Also offered are tips for selecting the best GPR equipment and best practices f