Skip to main content

Spain: Acciona and Copcisa awarded Tres Ponts road tunnel project

A consortium led by Acciona and Copcisa has won a €34.5 million contract to build the Tres Ponts road tunnel in Spain’s Pyrenees mountains.
June 27, 2017 Read time: 1 min
RSS

A consortium led by 976 Acciona and Copcisa has won a €34.5 million contract to build the Tres Ponts road tunnel in Spain’s Pyrenees mountains.

The contract for 3km of the C-14 in Organya was awarded by the regional government of Catalonia. It includes a 1.3km tunnel by the Segre River and associated connecting roads. Work it to start later this year, for completion in 2020.

Local limestone hills around Tres Ponts are a favourite venue for rock climbers.

The C-14 runs from La Seu d'Urgell to Salou through Reus.

For more information on companies in this article

Related Content

  • Norwegian project awarded
    September 9, 2021
    An important Norwegian project has been awarded.
  • Mersey Gateway shortlist revealed
    March 14, 2012
    The shortlist of three bidders for the US$942million (£600m) plus Mersey Gateway Project in North West England has been revealed.
  • Simex machine helps deliver new tunnel lining
    December 1, 2014
    In Italy an MP1000 cutting system from Simex has been used to help resurface the walls of a highway tunnel. The SS51 State Road crosses through the Dolomites in the north-eastern Alpine Region of Italy. The SS51 starts in San Vendemiano in the province of Treviso and ends in Dobbiaco in the province of Bolzano and is a key road because it connects Cadore and the main towns in the area of Cortina d'Ampezzo. This 134.4 km road has expansion work and upgrades to improve safety and boost capacity. One the mo
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out