Skip to main content

Slovenia-Austria tunnel project contractor selection

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.
May 17, 2019 Read time: 1 min

Construction work is underway on the 8km Karavanke Tunnel connecting Austria and Slovenia. The work is being carried out at present from the Austrian end of the tunnel link. However the selection process for the contractor to handle the Slovenian end of the tunnel is now underway. Six firms have shown interest in the project and are in talks with the Slovenian state motorway operator, DARS.

Related Content

  • Germany tunnel and bridge projects being discussed
    February 27, 2018
    Projects to improve historic tunnel and bridge links are now progressing in Germany after some delays. These are for the refurbishment of the old Elbe Tunnel in Hamburg and a bridge upgrade in Cologne. Stretching some 426m, the Old Elbe Tunnel runs from the St Pauli area on the north of the River Elbe to the port area in the south. Opened in 1911 the twin tube tunnel is of historic value, even though its importance for vehicle traffic is now comparatively minor following the opening of a new road tunnel in
  • South Korea road tunnel project
    May 31, 2023
    A challenging South Korean road tunnel project is being proposed.
  • Nepal road improvement project starts
    March 28, 2019
    Work is now underway on a major road improvement project in central Nepal. The Chinese contractor, China Construction Seventh Engineering Division (CSSED), is carrying out the upgrade of the East-West Highway route linking Narayagadh and Butwal. The 131km road improvement project is worth US$142.9 million and is expected to be ready by the end of 2022. The project will boost capacity and safety for drivers on the route by widening the road so that it has two lanes in either direction, rather than just one l
  • STRABAG wins Austria highway widening deal
    October 6, 2016
    STRABAG will handle the contract to widen Austria’s A1 highway in Austria between Matzleinsdorf and Pöchlarn. The €22 million contract involves widening to three lanes and has a scheduled completion date of May 2018. The contract also includes widening eight bridges along the 5.1km section. Construction work is now underway on the project.