Skip to main content

Scottish road upgrade being planned

Plans have been unveiled for a proposed road upgrade project in Scotland. These plans show the preferred route for the upgrade to the A96 between Nairn and Fochabers, towns which lie to the east of Inverness on Scotland’s North East coast. The project is being planned by Transport Scotland and will see the 45km road section being upgraded to dual carriageway status. The work will include building new crossings over the Aberdeen to Inverness rail links, as well as over the Spey, Findhorn and Lossie rivers.
December 6, 2018 Read time: 2 mins

Plans have been unveiled for a proposed road upgrade project in Scotland. These plans show the preferred route for the upgrade to the A96 between Nairn and Fochabers, towns which lie to the east of Inverness on Scotland’s North East coast. The project is being planned by Transport Scotland and will see the 45km road section being upgraded to dual carriageway status.

The work will include building new crossings over the Aberdeen to Inverness rail links, as well as over the Spey, Findhorn and Lossie rivers. Building a bridge over the Spey River will be subject to particularly strict environmental requirements as this river is central to some of Scotland’s most historic whisky distilleries.

Upgrading the A96 is long overdue as the present road does not cope well with traffic demand. The route is also subject to closures in winter, with the upgrade likely to make it easier to clear when conditions are severe. At present just 22km of the A96 route between Inverness and Aberdeen is of dual carriageway status. The plans call for the remaining 138km of the 160km A96 route between Inverness and Aberdeen to be upgraded to dual carriageway status.

Related Content

  • US$4.86 billion infrastructure works for Vietnam
    October 30, 2024
    Transport infrastructure works worth US$4.86 billion are planned for Vietnam.
  • Poland road tenders being announced
    October 5, 2015
    Polish General Directorate for National Roads and Motorways (GDDKiA) is announcing tenders for the construction of a series of major routes. One key stretch is for a 41km section of the S14 dual carriageway, which will link the A2 highway with the S8 dual carriageway and which will constitute Lodz's western ring-road. According to declarations of the Polish Infrastructure and Development Ministry, work on the S14 project will commence in 2016.
  • Providence Viaduct project underway
    September 4, 2020
    Work is now underway on the Providence Viaduct project.
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident