Skip to main content

Scottish fixed link project planned

A Scottish fixed link project is being planned to replace a ferry service.
By MJ Woof April 30, 2020 Read time: 2 mins
The existing Corran ferry service in the west of Scotland will need to be replaced – image courtesy © Alan5766, Dreamstime.com

A new fixed link project is being considered in North West Scotland to replace an existing ferry service. A feasibility study into the project has been carried out by Stantec, which was funded by Highland Council, the Highlands and Islands Transport Partnership (Hitrans) and Highlands and Islands Enterprise.

The proposal calls for a new fixed link crossing for Loch Linnhe and the report considers the potential project as being viable. This new link would replace the existing Corran ferry service, which runs between Nether Lochaber and the Ardnamurchan peninsula.

Both tunnel and bridge options are being considered in the report. The former is likely to be more expensive with an estimated cost range of €75 million - €122.7 million  (£66 million to £108 million). The latter option meanwhile has an estimated cost range of €47.7 million – €56.8 million (£42 million - £50 million).

The ferry carries around 250,000 cars/year and some 500,000 people/year and the journey takes around 5 minutes. This is one of the busiest ferry links in Europe that relies on a single vessel. However, the ferry is ageing and has suffered a number of mechanical problems. A propulsion unit had to be replaced recently, during which time the ferry was out of service. Replacing the ferry service with a fixed link, whether a tunnel or bridge, would reduce journey times and also help develop the economy in the area.

The issue of financing has yet to be considered. The project would be too costly for the Highland Council to fund, so other sources will have to be sourced. Transport Scotland would be required to give its backing for the project, including sourcing the funding, and is considering its options at present.

Related Content

  • Car-pool project for New York?
    July 5, 2012
    A major transport project could help reduce peak time congestion and improve traffic flow for New York City’s commuters. A US$300 million corridor for buses and car-poolers has been proposed for the Verrazano-Narrows Bridge. Should this project go ahead, it would be the first restricted lane on any of the tunnels and bridges of the Metropolitan Transportation Authority (MTA). The link would stretch across State Island and north to the mouth of the Brooklyn-Battery Tunnel. Should the project be approved it w
  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • ARTBA sees growth for US transport construction
    December 5, 2017
    Steady growth in the US market for transport infrastructure construction in 2018. This prediction comes from a new report by the American Road & Transportation Builders Association (ARTBA). The report suggests that the US transportation infrastructure market will rebound slightly next year, following a 2.8% drop in 2017.
  • South Sudan road link project
    September 30, 2022
    A major road project for South Sudan has been awarded.