Skip to main content

Saudi Arabian transport infrastructure deals

A series of Saudi Arabian transport infrastructure deals will move ahead.
By MJ Woof December 11, 2020 Read time: 1 min
New transport infrastructure is being planned for Saudi Arabia’s Red Sea tourism project – image courtesy of © Indos82, Dreamstime.com
A series of infrastructure works will be carried out in Saudi Arabia. A package of works worth US$2 billion is being handled by Red Sea Development. A significant portion of the contracts for the construction of the project have already been awarded to local firms.

Work on the Red Sea tourism project commenced in early 2019. The plans call for the construction of a new road network.

Meanwhile a firm in the UAE, DuBox Precast Products Industrial, is establishing a site that will supply the precast components required for the new transport links.

According to the firm, the Red Sea Project is an ambitious tourism development, offering a site that includes an archipelago of more than 90 islands, sweeping desert, mountain landscapes and 200km of coastline. The new transport infrastructure required includes the construction of a new airport.

Related Content

  • New Doha highway under construction
    March 18, 2016
    Construction is now underway on the New Orbital Highway in Doha, Qatar. This project is called The New Orbital Highway contract 2 and is one of the largest projects being delivered through the Qatar’s public work authority Ashghal. The work consists of the design and construction of 47km of highway with a five-lane dual carriageway for light vehicles and two truck lanes in each direction. It also includes six viaducts, 17 bridges and underpasses and a 320m cut-and-cover tunnel. This last is particularly
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • UK’s A14 upgraded route opening early
    October 14, 2019
    A key section of the UK’s important A14 upgrade project is opening to traffic ahead of schedule. Work to deliver the new stretch of dual carriageway for the A14 bypass is being completed a full 12 months early. The bypass section will open to drivers in December 2019, cutting congestion and journey times. Work on the 19km bypass section commenced in October 2016 and forms part of a programme of 33.6km of road works in Cambridgeshire, costing £1.5 billion. The road building project has been carried out by
  • Mega city transport in Mexico
    June 13, 2012
    Rapid urban growth is resulting in massive mega cities with major transport needs and Mexico City is one of the world’s largest – Mike Woof reports Mexico City is a vast, sprawling metropolis and one of the world’s largest cities, resulting in huge problems for its inhabitants, particularly with regard to infrastructure. Measuring population size is an inexact science for large cities as suburban areas can add to the figures considerably, especially in developing nations where unplanned expansion is as comm