Skip to main content

Saudi Arabia sea crossing planned

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.
July 24, 2019 Read time: 1 min

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.

Related Content

  • Colorado river bridge relieves congestion
    February 7, 2012
    Built in the shadow of the Hoover Dam, a new bridge is set to takes its place as another major tourist attraction. Patrick Smith reports
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Bridge project uses high performing formwork
    February 20, 2012
    Doka designed and supplied a high-performing formwork technology solution for a challenging bridge project south of the German town of Halle. The 8,614m long single-cell box girder superstructure of the Saale-Elster Viaduct, with a typical cross section width of 13.9m, is borne on 220 piers, and has a constructional depth of 4m. It is mainly being erected on launching girders to minimise the impact on flora and fauna.