Skip to main content

Rotterdam’s bridge link upgrade project

Rotterdam’s bridge link upgrade project is being planned.
By MJ Woof June 18, 2020 Read time: 1 min
The Van Brienenoordbrug in Rotterdam will be upgraded – image © courtesy André Muller, Dreamstime.com

Upgrade work is being planned in The Netherlands for Rotterdam’s Van Brienenoordbrug bridge. The work is expected to cost from €380-600 million to carry out. The work is intended to commence in 2025 and should be complete by 2027.

The tied-arch bridge features inclined hangers and was opened to traffic in 1965. A new temporary bridge will be constructed alongside the existing structure to carry traffic while the work is carried out.

The 1.32km bridge carries six lanes of traffic in either direction, handling around 250,000 vehicles/day. The bridge forms part of the A16 highway, the busiest route in The Netherlands.

The improvements are needed to help upgrade and reinforce the structure of the bridge due to the enormous traffic load it has to cope with.

Related Content

  • £317 million UK highway project delayed
    February 12, 2025
    A £317 million UK highway project is delayed.
  • New Turkey tunnels for Istanbul and Izmir
    May 31, 2017
    New tunnel connections are to be built in Istanbul and Izmir, along with a new bridge in Izmir. Work is due to start shortly on the Grand Istanbul Tunnel Project. This will be a three level tunnel and should help lower congestion in Istanbul, which suffers amongst the worst traffic jams of any city in the world.
  • €944.7 million for Czech highway links
    January 10, 2025
    €944.7 million being spent for for Czech highway links.
  • Nepal bridge building receiving funding
    June 4, 2018
    Financing from the World Bank will help pay for bridge building work in Nepal. The road from Muglin to Narayanghat is being widened currently, which will see the route featuring a lane in either direction, rather than the single lane that carries all traffic at present. This will boost its capacity and reduce delays to drivers on the route, which carries around 20,000 vehicles/day. Improving the 36km, north-south route however requires the construction of 18 new bridges. Much of the route is already surface