Skip to main content

Queensland airport link incurs costs

In Australia contractor Leighton Holdings intends to reclaim extra costs incurred for a major airport link road project in Queensland.
February 14, 2012 Read time: 1 min
In Australia contractor 2474 Leighton Holdings intends to reclaim extra costs incurred for a major airport link road project in Queensland. Leighton Holdings says that it was hit by extra costs for Brisbane Airport Link's road and tunnel project due to the state's floods and bad weather, design amendments and approval delays from access issues and authorities. The project's net forecast fell to US$457.3 million (A$430 million) loss. The project is expected to be ready by the end of June next year and is being built by 2641 BrisConnections, in which Leighton subsidiary 2642 Thiess is a component.

For more information on companies in this article

Related Content

  • Improved runways for Jeddah International Airport
    August 21, 2013
    With an increasing number of aircraft using Jeddah International Airport in Saudi Arabia, the authorities realised there was a need to upgrade the facilities. King Abdulaziz International Airport opened in 1982 and serves over 15 million passengers/year, with a high percentage travelling on the annual Islamic pilgrimage to Mecca, some 80km away. The city has the largest port on the Red Sea and is named after Abd al-Aziz ibn Saud, the former king and founding father of Saudi Arabia, and is one of the kin
  • 2-year delay to new Kentucky bridge could cost US $300mn
    August 24, 2012
    The cost of the Brent Spence Bridge project in Kentucky could rise by US $300 million, to around US $2.76 billion, if its completion is delayed by two years, according to a report by the US Federal Highway Administration.
  • New Mexican road links underway
    June 22, 2021
    New road links are being built in Mexico.
  • Kenya’s international airport link now more costly
    March 9, 2018
    Dissatisfaction has been expressed in Kenya over the increased cost for the highway upgrade connecting capital Nairobi with its international airport. The new highway link will cost nearly US$584 million, instead of the $376 million originally anticipated. The link has had to be redesigned and will now feature a number of flyover sections and underpasses instead of being elevated for the entire 43.5km stretch between the airport and Rironi. The new highway section will be tolled and will connect Jomo Kenyat