Skip to main content

Polish road project – bids submitted

Bids have now been submitted for a key Polish road project.
By MJ Woof September 29, 2020 Read time: 1 min
Bidding is complete for an important dual carriageway project in Poland - image courtesy © Bigandt, Dreamstime.com
The bidding stage for the S19 road project in Poland is now being completed. The local contractor, Budimex, submitted the leading bid for the project.

The new dual carriageway will connect Bialystok Zachod with Bialystok Ksiezno junction. Budimex made a bid of close to €109 million for the work.

Related Content

  • Highways expansion project in Los Angeles area
    August 9, 2017
    A loan worth US$629 million will help pay for a highway upgrade for the I-405 route in Orange County, California. The stretch of I-405 connects with Costa Mesa, on the southern side of Los Angeles. The federal loan is being provided by the US Department of Transportation to the Orange County Transportation Authority (OCTA). The work is to upgrade a 22.4km stretch of I-405 between its junction with the I-605 Interstate, close to Rossmoor, and the SR 73 route at Costa Mesa, which connects with the nearby John
  • Poland’s GDDKiA promises to improve road procurement processes
    January 12, 2015
    The Polish national roads authority GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality. Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also b
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Emergency areas for UK’s M1 complete
    April 16, 2025
    Emergency areas have been completed for the UK’s M1 motorway.