Skip to main content

Pittsburgh plans propose Parsons for bridge project

Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehab
January 9, 2014 Read time: 2 mins
2693 Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehabilitated in 1973, the existing superstructure is a Warren Pratt truss featuring two lanes and sidewalks on both sides. Parsons Brinckerhoff will serve as prime consultant for preliminary engineering, final design, and construction-phase services for the new bridge. The team will also evaluate customised lighting and architectural features for community cohesion. Accelerated bridge construction techniques will be employed to reduce construction time, which should commence in 2016 and be completed in one construction season.

For more information on companies in this article

Related Content

  • New US bridge link for Capital Beltway
    November 18, 2019
    A plan is now in hand to replace the American Legion Bridge in the US, which spans the Potomac River.
  • Cianbro picks up another contract for Washington’s Memorial Bridge
    July 15, 2015
    The 1930’s Arlington Memorial Bridge in Washington, which has carried US presidents and military heroes across the Potomac River to the famous Arlington Cemetery, is to undergo refurbishment, again. Cianbro Corporation, based in the state of Maine and which worked on the bridge in 2013, picked up the contract for US$2,523,520, according to a notice on the FedBizOpps.gov website. The Federal Business Opportunities website had earlier this year asked for submissions for the work: “The project will be sp
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c