Skip to main content

Philippines bypass works

Bypass works in the Philippines bypass are being planned.
By MJ Woof November 18, 2020 Read time: 1 min
Construction work on the new Davao City bypass is being planned in the Philippines – image © Indos82, Dreamstime.com
Construction works are being planned for the Davao City bypass in the Philippines. The first stage of the project is expected to cost US$273.3 million. A portion of the funding required will be provided by the Japan International Cooperation Agency (JICA).

The contract for the first section of the bypass will be carried out by two Japanese construction companies, Takenaka Civil Engineering & Construction, Shimizu and Ulticon Builders. One of the most challenging portions of this stage of the bypass will be the building of a new tunnel section.

Related Content

  • Cameroon highway construction project underway
    August 31, 2021
    Work is now well underway on a key highway project in Cameroon.
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • New crossing planned for Kerch Strait
    June 10, 2014
    Plans for a new crossing for the Kerch Strait are now moving forward. The Russian roads company Avtodor is in charge of the project, which calls for the building of both road and rail connections. As series of options are being considered and in all the work is expected to cost in the region of US$8.2-$10.9 billion. There are eight options being investigated at present, with five looking at bridges to carry both road and rail and a further three for combined connections with bridges for the roads and tunnel
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent