Skip to main content

Parsons wins Florida interchange redesign contract

The Florida Department of Transportation has awarded Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected. The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-9
February 23, 2017 Read time: 2 mins
Parsons will carry out a project to research and then upgrade a busy interchange on I-95 in Florida
The 2697 Florida Department of Transportation has awarded 3220 Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected.

The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-95/LGPA Boulevard interchange is a crucial access point during morning and evening rush-hour traffic. The proposed reconfiguration will improve traffic conditions by boosting capacity to handle the projected traffic through the 2040 design year. Staged construction with interim improvements will be considered to address safety and operational issues associated with the current interchange configuration.

The Parsons team will analyse traffic patterns, propose conceptual interchange modifications and collaborate with area planning organisations and local government. The aim will be to alleviate traffic queues, increase driver safety, and improve the overall traffic flow. After FDOT District 5 approves the interchange concept, Parsons will prepare an interchange modification report and develop engineering plans for construction.

For more information on companies in this article

Related Content

  • Koh Samui-Surat Thani bridge still on
    April 14, 2025
    Surachet Laopoolsuk, head of the Expressway Authority, Exat, reportedly said that the bridge could be open by 2034.
  • Innovative solutions to earthmoving needs
    January 3, 2013
    Several manufacturers are offering improved earthmoving machines, with more to come - Mike Woof reports. One of the most notable developments comes from Caterpillar, with the unveiling of a hybrid excavator in the shape of its 336E H model. The machine is having its public launch at the bauma exhibition in Spring 2013 and will start rolling out of the factory in March 2013, while customers will be able to place orders from February 2013. Unlike other hybrid excavators on the market at present, the Cat 336E
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of
  • Successful pavement maintenance
    February 16, 2012
    This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc