Skip to main content

Norwegian tunnels needs safety improvements

Investigations into tunnel safety in Norway have revealed that there are 148 requiring safety upgrades. The 148 tunnels do not meet current EU safety requirements. The EU's road tunnel safety directive was introduced in 2007 and the deadline for the work to be carried out is April 1st, 2019. The necessary upgrade is estimated to cost €873.82 million.
August 17, 2015 Read time: 1 min
Investigations into tunnel safety in Norway have revealed that there are 148 requiring safety upgrades. The 148 tunnels do not meet current EU safety requirements. The EU's road tunnel safety directive was introduced in 2007 and the deadline for the work to be carried out is April 1st, 2019. The necessary upgrade is estimated to cost €873.82 million.

A risk analysis for tunnel fires presented by the Directorate for Civil Protection and Emergency Planning (Direktoratet for samfunnssikkerhet og beredskap) in 2014 reveals that that there have been an average of 21 fires/year in Norwegian tunnels during the last eight years. Luckily, most of the fires are small with limited consequences. The analysis, involving 67 tunnels, shows that heavy vehicles were involved in seven out of 12 fires.

Related Content

  • Severn Bridge to have weight restrictions
    April 15, 2025
    The restrictions start May 27 when heavy goods vehicles must use the nearby cable-stayed M4 motorway Prince of Wales Bridge between England and Wales.
  • New methods for non-destructive concrete testing
    August 29, 2017
    How best is it possible to assess the state of concrete in a road pavement, bridge deck or tunnel wall? One of the most reliable ways is to take a core of concrete from the structure to analyse and test in the laboratory. One downside to this method is that doing the test creates weak points in the structure that must then be repaired. Another is that the frequency of such cores cannot be too great – so it is possible that some problem areas will be missed. New technologies from the world of geospatial eng
  • IRF calls for action on road traffic noise
    July 12, 2012
    According to the European Union Directive 2002/49/EC relating to the assessment and management of environmental noise (END), the Member States of the European Union have committed to abide by a strict timetable of milestones and deliverables, all aimed at reducing current levels of noise and improving the life of Europe's citizens. As part of this overall strategy, European leaders were required to submit national noise action plans by 18 January of this year, targeting major roads and all agglomerations wi
  • Signify’s LEDs for Dublin tunnel
    August 1, 2023
    Lighting specialist Signify has equipped the 9km-long Dublin Port Tunnel in Ireland with energy efficient LED lighting for all the route’s 1,800 light points. The quality of lighting for drivers in the tunnel improved from CRI25 to CRI70