Skip to main content

Norwegian tunnels needs safety improvements

Investigations into tunnel safety in Norway have revealed that there are 148 requiring safety upgrades. The 148 tunnels do not meet current EU safety requirements. The EU's road tunnel safety directive was introduced in 2007 and the deadline for the work to be carried out is April 1st, 2019. The necessary upgrade is estimated to cost €873.82 million.
August 17, 2015 Read time: 1 min
Investigations into tunnel safety in Norway have revealed that there are 148 requiring safety upgrades. The 148 tunnels do not meet current EU safety requirements. The EU's road tunnel safety directive was introduced in 2007 and the deadline for the work to be carried out is April 1st, 2019. The necessary upgrade is estimated to cost €873.82 million.

A risk analysis for tunnel fires presented by the Directorate for Civil Protection and Emergency Planning (Direktoratet for samfunnssikkerhet og beredskap) in 2014 reveals that that there have been an average of 21 fires/year in Norwegian tunnels during the last eight years. Luckily, most of the fires are small with limited consequences. The analysis, involving 67 tunnels, shows that heavy vehicles were involved in seven out of 12 fires.

Related Content

  • EU road fatalities fall by 11% in 2010
    February 28, 2012
    The European Commission has published new statistics showing that EU road fatalities decreased by 11 per cent in 2010.
  • Crash cushion design
    February 13, 2012
    There are key differences in crash cushion design and quality for the United States and European markets. Developments in barrier technologies have followed the varying demands of specific markets, resulting in manufacturers offering different solutions for US and European needs.
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Nuphalt’s novel patching system offers fast and efficient road repairs
    September 2, 2014
    Fast, efficient and long-lasting repairs are claimed for the heating system developed by the Nu-Phalt Group Developed in the UK, the innovative Nu-Phalt pothole patching system equipment is now being widely used by various local authorities for road repairs. But this technology is also being employed internationally, with key sales in parts of Eastern Europe and India.