Skip to main content

Norway considers wooden bridge across Lake Mjosa

Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa. In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little. Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €
May 12, 2017 Read time: 2 mins
Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa.


In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little.

Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €410 million, according to Trond Arne Stensby, project manager at the Norwegian Public Roads Administration - 1208 Statens vegvesen.

The 468m-deep Lake Mjøsa is one of the deepest in Europe and the fourth-deepest lake in Norway. It stretches for 117km and is about 15km at its widest. The lake is 123m above sea level and lies about 100km north of the capital Oslo.

One bridge already crosses the lake, the Mjøsa Bridge that was opened 1985 and is part of the main north-south highway in Norway, the E6. The concrete box girder bridge has spans of around 69m and rests on piles in water up to 40m deep. The bridge has two lanes of traffic and separate pedestrian and cycling lane.

Previous studies have considered a four-lane link on Highway E6 between the cities of Hamar and Lillehammer – site of the 1994 Winter Olympics. Timber construction alternatives include a truss structure with two underlying trusses composite with a concrete bridge deck. Typical span width is 69m and be cable stay supported.

For more information on companies in this article

Related Content

  • Italy’s horrific bridge collapse is a sign of a wider problem
    January 7, 2019
    The shocking collapse of a major highway bridge in the Italian city of Genoa has highlighted a major problem with regard to poor infrastructure condition in the country. Causing multiple fatalities, the cable-stayed Morandi Bridge suffered a spectacular failure of a central support. Homes have had to be evacuated and it seems likely that the bridge, opened in 1967, will now have to be demolished. However, warnings had been given. The unusual bridge design, with its thin deck and reinforced concrete stays
  • Øresund Bridge invests in storm protection
    March 8, 2022
    Danish consortium Øresundsbro Konsortiet will install walls and ramparts near tunnel openings.
  • Cranes help construct major bridge project in China
    September 8, 2014
    A number of tower cranes have helped complete the Chishi Grand Bridge project in China. Six Potain tower cranes were used to build two 280m tall bridge pylons, high in the clouds above the mountains of southern China. The cranes spent 30 months building the pylons at the Chishi Grand Bridge, which will span 1.47km and carry its road deck 180m above the ground. The bridge will open at the end of 2014.
  • Renfrew Bridge opening tests complete
    August 28, 2024
    The 184m-long cable-stay bridge near Glasgow, Scotland, will be the first road bridge across the River Clyde to open for passing ships.