Skip to main content

Norway considers wooden bridge across Lake Mjosa

Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa. In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little. Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €
May 12, 2017 Read time: 2 mins
Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa.


In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little.

Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €410 million, according to Trond Arne Stensby, project manager at the Norwegian Public Roads Administration - 1208 Statens vegvesen.

The 468m-deep Lake Mjøsa is one of the deepest in Europe and the fourth-deepest lake in Norway. It stretches for 117km and is about 15km at its widest. The lake is 123m above sea level and lies about 100km north of the capital Oslo.

One bridge already crosses the lake, the Mjøsa Bridge that was opened 1985 and is part of the main north-south highway in Norway, the E6. The concrete box girder bridge has spans of around 69m and rests on piles in water up to 40m deep. The bridge has two lanes of traffic and separate pedestrian and cycling lane.

Previous studies have considered a four-lane link on Highway E6 between the cities of Hamar and Lillehammer – site of the 1994 Winter Olympics. Timber construction alternatives include a truss structure with two underlying trusses composite with a concrete bridge deck. Typical span width is 69m and be cable stay supported.

For more information on companies in this article

Related Content

  • New bridge for China
    October 28, 2020
    A new bridge will be built in China’s Hubei Province
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia.
  • Twinning Bribie Bridge is preferred option
    May 9, 2025
    The existing Bribie Island Bridge, near Brisbane, Australia, was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.