Skip to main content

New US$24.4 million Rwanda-Tanzania link bridge

A 40-year-old bridge used to connect Tanzania and Rwanda in East Africa will be replaced with the new US$24.4 million Rusumo International Bridge. The new Japan International Cooperation Agency funded structure is currently under construction across the Akegera River. The project includes the construction of a 2km road that links two custom offices, the new dual carriage bridge and also the installation of needed tools and suitable parking. The 80m-width will raise the axle road restriction to 20tonnes, fro
November 11, 2013 Read time: 1 min
A 40-year-old bridge used to connect Tanzania and Rwanda in East Africa will be replaced with the new US$24.4 million Rusumo International Bridge. The new 3349 Japan International Cooperation Agency funded structure is currently under construction across the Akegera River. The project includes the construction of a 2km road that links two custom offices, the new dual carriage bridge and also the installation of needed tools and suitable parking. The 80m-width will raise the axle road restriction to 20tonnes, from the present eight tonnes. It will also increase the speed limit from 5km/h to 30km/h, according to Eng Honore Munyanshongore from the Rwanda Transport Development Agency. Due for completion by November 2014, the new bridge is set to have a carry capacity of 180 tonnes.

Related Content

  • Tanzania’s road development plan
    August 25, 2022
    Tanzania is setting out plans for its road network development.
  • Hydrodemolition equipment helps Swiss bridge rebuild
    December 2, 2014
    A highway bridge in Switzerland has been refurbished with help from hydrodemolition equipment supplied by Aquajet The firm’s latest Rotolance 2500 was used alongside an Aquacutter 710 VE evolution on the Viaduc de Chillon link, above Lake Geneva. The machines were used by Zurich-based hydrodemolition specialist contractor, Walo Hydrodynamik, to remove more than 25,000m³ of concrete deck on the bridge.
  • Peri has Polish bridge covered
    February 6, 2012
    A new bridge is being constructed across the Vistula River near Grudzi?dz, Poland, and for the foreland bridge from south-east direction, a so-called incremental launching method is being used. Two lanes, each some 556m long, are being constructed in 25 concreting cycles with standard lengths of 24m, while the formwork is 25m long and is positioned behind the bridge abutments.
  • Nigeria has built a major road link from concrete
    September 14, 2016
    A new concrete road is now open to traffic in Nigeria’s Kogi State. This is of note as the new 24km road is the now the country’s longest to be made from concrete. The new road was built in a joint venture partnership between Nigerian firm Dangote Construction and Brazilian company Andrade Gutierrez. The new road connects Kabba with Obajana. Part of the Dangote Group, Dangote Construction was well placed to carry out the work as it operates its Obajana Cement production facility, at Obajana. This new road