Skip to main content

New US$24.4 million Rwanda-Tanzania link bridge

A 40-year-old bridge used to connect Tanzania and Rwanda in East Africa will be replaced with the new US$24.4 million Rusumo International Bridge. The new Japan International Cooperation Agency funded structure is currently under construction across the Akegera River. The project includes the construction of a 2km road that links two custom offices, the new dual carriage bridge and also the installation of needed tools and suitable parking. The 80m-width will raise the axle road restriction to 20tonnes, fro
November 11, 2013 Read time: 1 min
A 40-year-old bridge used to connect Tanzania and Rwanda in East Africa will be replaced with the new US$24.4 million Rusumo International Bridge. The new 3349 Japan International Cooperation Agency funded structure is currently under construction across the Akegera River. The project includes the construction of a 2km road that links two custom offices, the new dual carriage bridge and also the installation of needed tools and suitable parking. The 80m-width will raise the axle road restriction to 20tonnes, from the present eight tonnes. It will also increase the speed limit from 5km/h to 30km/h, according to Eng Honore Munyanshongore from the Rwanda Transport Development Agency. Due for completion by November 2014, the new bridge is set to have a carry capacity of 180 tonnes.

Related Content

  • Vietnam link due
    March 14, 2012
    Construction of Vietnam’s Da Nang - Quang Ngai Expressway is due to commence at the end of 2012.
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • Barrier innovation putting traffic safety and flow first
    April 3, 2014
    Cutting-edge barriers offering greater safety at the same time as limiting traffic disruption are proving in demand on busy world highways, as Guy Woodford reports Small footprint; minimum disruption after impact; lower labour costs; all said to be elements contributing to the growing popularity of the Trend terminal from Trinity Highway Products. This family of end terminals offers a range of safe and efficient solutions to barrier ends with quick and easy assembly and installation. Trinity claims th