Skip to main content

New Turkish tunnel project being studied

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.
March 11, 2019 Read time: 1 min

A study is being carried out for a proposed combined use tunnel project in Turkey. The proposal is for a tunnel featuring three levels that would be able to handle both 75,000 passengers/hour by rail and 120,000 vehicles/day. The study should be complete during 2019, with a tender process expected soon after. Should the project go ahead, the build-operate-transfer model will be utilised.

Related Content

  • Turkish tunnel project on track
    October 31, 2014
    Progress is said to be on track for the Eurasia Tunnel being constructed in Turkey. Around 33% of the link has already been built. This project will be the first tunnel link for Istanbul and will provide a vehicle crossing for the Bosporus. Construction work commenced in April 2014. The tunnel will be 95m deep and the underground construction work is due for completion by the end of 2015. Meanwhile the fitting out work and connecting links to the tunnel will be complete by August 2017. The tunnel will be 14
  • Voting for tunnel in Switzerland
    February 29, 2012
    Voting has been held in Switzerland for the construction of a second tunnel for road traffic at Gotthard.
  • Road and bridge upgrades improving transport in Nepal
    November 1, 2019
    New road and bridge upgrades are being introduced in Nepal that will help improve transport and develop the country’s economy.
  • Major road deals for France
    May 3, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.