Skip to main content

New third Don River bridge project planned for Aberdeen

A new bridge is planned for the Scottish city of Aberdeen, centre of the country’s oil industry. Continued growth in the city from the oil industry is fuelling an increase in vehicle numbers, with congestion a serious problem. As a result, Aberdeen City Council has given a contract to Balfour Beatty to construct the Third Don Crossing at a cost of some €17.6 million (£14.3 million). The two existing crossings to the north of the city centre suffer heavy congestion at peak periods at present and this new bri
August 27, 2014 Read time: 2 mins

A new bridge is planned for the Scottish city of Aberdeen, centre of the country’s oil industry. Continued growth in the city from the oil industry is fuelling an increase in vehicle numbers, with congestion a serious problem. As a result, Aberdeen City Council has given a contract to 1146 Balfour Beatty to construct the Third Don Crossing at a cost of some €17.6 million (£14.3 million). The two existing crossings to the north of the city centre suffer heavy congestion at peak periods at present and this new bridge is intended to alleviate the problem.

Balfour Beatty will build the new 90m span over the River Don, which will feature twin open box steel girders supporting a reinforced concrete deck. The company will also build a smaller bridge across a mill lade and 2.5km of road, including a stretch of new carriageway linking to the road network north of the river, as well as the realignment and upgrade of roads to the south. Construction is commencing and completion is planned for late 2015.

For more information on companies in this article

Related Content

  • Korea strategy
    February 6, 2012
    South Korea is setting an ambitious transport and infrastructure budget for 2010. The country intends to invest US$52.51 billion on projects for new roads and highways, as well as rail and port developments.
  • Moscow-Kazan highway plans
    June 17, 2020
    The Moscow-Kazan highway plans form part of the nation’s future economic recovery.
  • Peerless performance for Aggregate Industries on Nene Bridge job
    June 4, 2019
    Aggregate Industries is supplying its Lytacrete secondary aggregate solution for the US$6.5 million Nene Bridge structural refurbishment project near Peterborough, England.
  • Steel for Loch Ba bridge
    February 6, 2012
    Allerton Steel, on behalf of R J McLeod, has fabricated the steelwork for a replacement bridge at Loch Ba on Rannoch Moor in the Highlands as part of its A82 upgrade scheme for Transport Scotland. R J McLeod is the civil contractor on the £2.2 million (E2.6 million) scheme which replaces the existing three-span reinforced concrete bridge.