Skip to main content

New Russian bridge project to span Samara River

Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.
October 21, 2014 Read time: 1 min
Construction work is due to start shortly on the new Frunzensky Bridge in Russia, which will span the Samara River. The project is expected to take 35 months to carry out with the start date having been announced as December 2014. The work will also include building a new junction to connect the approach to the bridge with an existing highway. The project cost has been budgeted at just over US$264 million.

Related Content

  • Cambodian road and bridge connection project planned
    September 17, 2019
    A new road and bridge project in Cambodia will improve transport between Kampong Thom Province and Kampong Chhang Province. The project is expected cost US$200 million and is being planned by the country’s Ministry of Public Works and Transport. Work on the project is intended to commence in 2021 and will result in the construction of a new 57km road link that will boost trade, tourism and the economic development of these neighbouring provinces. The road will link to the 3.9km bridge spanning the Tonle Sap
  • Nepal's new pedestrian bridges
    March 22, 2012
    Improved pedestrian safety and smoother traffic flow will result from work being carried out by Nepal’s Department of Roads. The plan will see the construction of 15 pedestrian bridges along the Tinkune-Suryabinayak section of the Araniko Highway.
  • Innovative bridge project for Indonesia
    May 6, 2016
    A highly innovative bridge project is planned for Indonesia. A specialist firm from the Netherlands, Tidal Bridge, has been contracted to construct the new Pancasila Palmerah Bridge in East Nusa Tenggara. The project involves constructing a 1.3km suspension bridge that will span the Larantuka Strait and connect Flores with Adonara Island. The project is expected to cost US$400 million and construction work is due to commence in December 2016. Of the bridge's 1.3km total length, around 800m will span Larantu
  • Work to start on Tyne Bridge refurbishment
    March 11, 2024
    In the UK, Esh Construction was appointed by Newcastle and Gateshead councils in June 2022 to carry out the €48.5 million programme of repairs.