Skip to main content

A new road project for Mexico City

A major new road project is being proposed for Mexico City.
By MJ Woof September 4, 2020 Read time: 1 min
A major new road project is planned for Mexico City to help deal with the city’s chronic traffic congestion - image © courtesy of Mike Woof

A major new road project is being proposed for Mexico City in a bid to help reduce the heavy peak time congestion. Building a 4.8km road and connecting links on the west of Mexico City could come with a pricetag of some US$1.06 billion.

Building this link is expected to take around five years to carry out. The project will include tunnel sections, stretches of elevated viaduct and link roads. The work is needed however given Mexico City’s chronic traffic congestion, which often results in lengthy delays for drivers at peak periods. Although accurate figures are hard to obtain due to the number of people living in unofficial developments around the city, it is recognised that Mexico City has surpassed Seoul in South Korea to become the world’s second largest city by population, after Tokyo in Japan.

Related Content

  • Modal shift in city transportation
    March 4, 2016
    The TV footage of the recent heavy smog in Beijing and other Chinese cities has shown clearly why attitudes to personal transportation need to change around the world. Vehicle transportation is a major source of air pollution, with the particulates from older generation diesel engines being particularly dangerous to health.
  • Regensburg road revamp will widen key stretch
    February 16, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the
  • New UK road link planned
    August 25, 2020
    A new UK road project is being planned.
  • Bertha readies for more Seattle SR99 Alaskan Way Viaduct tunnel work
    July 27, 2015
    Bertha, one of the world’s largest tunnelling machines will resume work underneath the US city of Seattle in November, nearly two years after breaking down. Bertha, at 17.4m diameter, began her journey in July 2013. She was boring a path to relocate a 3.2km stretch of the elevated State Route 99 Alaskan Way Viaduct, built between 1949 and 1953 and which carries around 100,000 vehicles daily. The elevated section will be moved underground allowing the creation of public space along Seattle’s downtown w