Skip to main content

New Polish expressway project planned

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.
November 11, 2019 Read time: 1 min

Work is commencing on the S3 expressway project in Poland. Costing €355 million, the expressway will connect Bolko with Kamienna Gora Polnoc. A consrtium headed by Porr will handle the work, which is due for completion in the second half of 2023. The project will be complex as it will included two building tunnels as well as 12 bridges and flyovers.

Related Content

  • New Philippines tolled expressway link
    March 23, 2018
    A major new tolled expressway project is now being planned in the Philippines. The proposed NLEx-Cavitex Port Expressway Link will provide a connection between the North Luzon Expressway and Manila-Cavite Expressway. The project to build the link is expected to cost US$1.73 billion, with work being carried out in three stages of 5.7km, 4.8km and 4.6km. One of the most expensive stretches will include a tunnel section. The project is being planned by the Metro Pacific group.
  • Progress on Vietnam US$2bn transport infrastructure projects
    July 17, 2012
    Two major transport infrastructure projects in Vietnam with a combined value of more than US$2billion are a step closer to completion. A tender to appoint a contractor for the US$1.47billion Danang-Quang Ngai highway development has been published by Vietnam Expressway Corp (VEC).
  • Agreement signed for new road link in Nigeria
    September 18, 2017
    An agreement has been signed to pay for the construction of a new 34km road link in Nigeria’s River State. The new link will connect Bonny Island with Bodo, improving transport for this key industrial area of Nigeria. The agreement was signed jointly between the Nigerian Government, Julius Berger Nigeria, and Nigeria LNG. The road project is expected to cost US$331.62 million, with around half of the financing being provided by Nigeria LNG.
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang