Skip to main content

New motorway link for Hungary will be delayed

In Hungary the national infrastructure development company, NIF, says that a new stretch of the M0 orbital between the number 1 road and the number 10 road will not to be constructed before 2020. An environmental permit for the project is expected to be granted in the second half of 2016. The new stretch will feature two lanes in both directions and will be 18km long. A budget for the project has yet to be announced.
July 3, 2014 Read time: 1 min
In Hungary the national infrastructure development company, NIF, says that a new stretch of the M0 orbital between the number 1 road and the number 10 road will not to be constructed before 2020. An environmental permit for the project is expected to be granted in the second half of 2016. The new stretch will feature two lanes in both directions and will be 18km long. A budget for the project has yet to be announced.

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • New bridge planned for Yakutsk in Siberia
    April 12, 2013
    A new 3km long bridge is planned for Yakutsk in Siberia. This bridge will cross the River Lena and is at present expected to cost some US$1.74 billion to construct. The tender process for the project was initially to be held until the end of 2013. The timing of the tender process for the two lane bridge will now be announced in due course. Design and construction is expected to take six years once the contract is signed. Drivers will not pay tolls to use the bridge and instead the investor will be paid fees
  • Strabag leads consortium for planned Polish project
    July 24, 2014
    Austrian contractor Strabag will lead the consortium constructing a stretch of the S7 expressway in Poland. Strabag is teaming up with Heilit+Woerner for the project to build the Trasa Nowohucka section of the S7 linking Rybitwy and Igołomska and lying to the east of Kraków. Construction work is commencing in August/September 2014 and the contract is worth around €130 million. The consortium is handling the upgrading and construction work for some 18.6km of roads in all. The work includes widening a 4.5km l
  • Budgeting for Vietnam’s North-South Expressway project
    October 25, 2022
    Vietnam is budgeting for its North-South Expressway project.