Skip to main content

New Lagos bridge link being built

Construction work on a major urban bridge project will commence in Nigeria’s commercial centre Lagos during this year. A budget of US$2.66 billion has been set for building the Fourth Mainland Bridge, according to the Lagos State Government. The new bridge will be the longest of the bridges connecting Lagos Island to the mainland and will carry four lanes of traffic. Its construction is intended to cut congestion on the existing Eko, Carter and Third Mainland Bridges. Lagos suffers from amongst the heaviest
February 23, 2017 Read time: 2 mins
Construction work on a major urban bridge project will commence in Nigeria’s commercial centre Lagos during this year. A budget of US$2.66 billion has been set for building the Fourth Mainland Bridge, according to the Lagos State Government. The new bridge will be the longest of the bridges connecting Lagos Island to the mainland and will carry four lanes of traffic. Its construction is intended to cut congestion on the existing Eko, Carter and Third Mainland Bridges. Lagos suffers from amongst the heaviest traffic congestion of any city in the world and its ‘go slow’ that occurs at peak periods is notorious. The new route will run through Baiyeku, Langbasa and Lekki to Itamaga in Ikorodu and the project is being carried out under the build-operate-transfer model. The project will require the relocation of a number of homes in one of the city’s shanty town areas.

Related Content

  • Stonehenge Bypass Tunnel project facing judicial review
    February 19, 2021
    The UK’s Stonehenge Bypass Tunnel project is now facing a judicial review.
  • Egypt’s massive road building expansion programme
    February 17, 2020
    Egypt’s massive road building programme will boost transport links.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built