Skip to main content

New expressway for the Philippines under construction

A new expressway link in the Philippines is now under construction. The US$241.6 million South Luzon Tollway (SLTC) project will feature six separate sections. Work is due for completion in 18 months. The new route will cut journey times on the route between Santo Thomas and Barangay Mayao from three hours at present to just 45 minutes.
April 2, 2019 Read time: 1 min

A new expressway link in the Philippines is now under construction. The US$241.6 million South Luzon Tollway (SLTC) project will feature six separate sections. Work is due for completion in 18 months. The new route will cut journey times on the route between Santo Thomas and Barangay Mayao from three hours at present to just 45 minutes.

Related Content

  • New Bangkok expressway link planned
    January 8, 2019
    Work to the third section of Bangkok’s expressway project is being planned in Thailand. A section of the new expressway will use existing pillars on Prasert Manoonkij Road, constructed originally for a project that was subsequently abandoned in 1994. The new expressway section will connect the Kasetsart intersection with Nawamin Road. It will also connect with the Bang Yai intersection. The work is being carried out in two phases. The first will stretch 12.2km and will connect with Bangkok’s Outer Ring Road
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • Polish concrete plant production
    May 17, 2022
    A Lintec CCP3000D containerised concrete plant is helping with construction and work for Polish roads.