Skip to main content

New expressway for the Philippines under construction

A new expressway link in the Philippines is now under construction. The US$241.6 million South Luzon Tollway (SLTC) project will feature six separate sections. Work is due for completion in 18 months. The new route will cut journey times on the route between Santo Thomas and Barangay Mayao from three hours at present to just 45 minutes.
April 2, 2019 Read time: 1 min

A new expressway link in the Philippines is now under construction. The US$241.6 million South Luzon Tollway (SLTC) project will feature six separate sections. Work is due for completion in 18 months. The new route will cut journey times on the route between Santo Thomas and Barangay Mayao from three hours at present to just 45 minutes.

Related Content

  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Mexican bridge celebration
    March 22, 2012
    Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world.
  • New bridge under construction in Turkey
    March 28, 2014
    Work is underway on a new bridge structure in Turkey, with tower cranes playing a key role in the project The two Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.
  • $491 million improving roads for the Philippines
    July 15, 2025
    A budget of $491 million will help improve roads for the Philippines.