Skip to main content

New bridge for St Petersburg

A new US$181.7 million bridge is due to be built in the Russian city of St Petersburg.
March 2, 2012 Read time: 1 min
A new US$181.7 million bridge is due to be built in the Russian city of St Petersburg. The bridge will span the Bolshaya Nevka River and provide a link to Novo-Admiralteysky Island. The bridge is due for completion in the third quarter of 2013 and will be 265m long, while it will allow a 40m height clearance for vessels navigating the river. The work is being handled by Russian contractor 2964 Mostostroy No6, which won the tender process recently.

For more information on companies in this article

Related Content

  • Data handling for efficient machine control
    October 16, 2012
    The rapid increase in information availability is transforming the construction sector. Conventional methods used for sourcing geographic data based on maps and localised sampling meant that there was often a lack of accurate information relating to ground conditions at specific areas where work was planned, often resulting in unwelcome surprises for construction companies along with additional costs for projects.
  • Rader Hochbrücke construction set for summer
    April 7, 2025
    Work on the Rader Hochbrücke (bridge) near Rendsburg, Germany, will start this summer and take five years, according to DEGES.
  • GPS machine control paves the way for Turkish canal
    February 7, 2012
    GPS machine control for earthworks and concrete paving is helping to fast track construction of an irrigation canal in Turkey - Claire Symes reports. The Turkish economy is expected to flourish as a result of construction of a new irrigation channel currently underway in the east of the country. This canal is benefiting from the latest concrete paving and earthmoving technology and will bring with it prosperity to a deprived area of the country. But the project is already taking the lead in terms of Turkish
  • Philippine Biliran Bridge repairs start
    February 27, 2025
    The nearly US$500,000 project involves the replacement of corroded bolts and steel members and steel plates to the bridge that connects the islands of Biliran and Leyte.