Skip to main content

New bridge link for Tanzania

A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG).
March 21, 2012 Read time: 1 min
A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG). The 36 month project is for a bridge to span Magogoni Creek and the deal was signed between the Chinese firms and Tanzania's 4111 National Social Security Fund (NSSF).

For more information on companies in this article

Related Content

  • Senegal road development work planned
    March 14, 2022
    Road development work is planned for Senegal.
  • XCMG inks a deal with Sinopec to produce hydraulic fluids
    April 12, 2016
    Zhao Jian, of Sinopec, and Sun Jianzhong, vice president of XCMG Construction Machinery, officially signed an agreement for the two organisations to co-operate on developing hydraulic fluids. The deal was inked during an opening ceremony at bauma on the stand of XCMG, China’s largest construction machinery manufacturer. A spokesperson for XCMG said it is the first time that an agreement has been sig
  • Major bridge widening project going to plan
    April 11, 2012
    When built it was determined that a vital US road/rail bridge would always be widened. Work on that huge project is going to plan as Patrick Smith reports One of the biggest bridge widening projects in the world is being carried out under an ambitious development programme. At US$1.2 billion, the seven-year scheme to widen the Huey P. Long Bridge in the US state of Louisiana is also the largest of 16 projects planned under the state's TIMED (Transportation Infrastructure Model for Economic Development)
  • New bridge over China’s Yi River
    December 10, 2015
    A new bridge has been built in China that now spans the Yi River. A crane from XCMG has played a key role in the work, being used to erect the two 100m-high towers for the structure. The bridge is made from prestressed concrete and is a cable-stayed structure, with two towers providing support for the necessary cables. Building this large bridge required the use of sophisticated technology and the project team opted to use a 100m-high tower crane to help lift key elements of the structure into place. The c