Skip to main content

New Australia route in Victoria

Work is set to commence on a new bypass in Australia’s Victoria State in 2019, with the work planned for completion in 2022. The new Mordialloc Bypass will run from the existing Dingley Bypass to the Mornington Peninsula Freeway. The project is expected to cost US$226.3 million (A$300 million).
May 5, 2017 Read time: 1 min

Work is set to commence on a new bypass in Australia’s Victoria State in 2019, with the work planned for completion in 2022. The new Mordialloc Bypass will run from the existing Dingley Bypass to the Mornington Peninsula Freeway. The project is expected to cost US$226.3 million (A$300 million).

Related Content

  • Russian road and bridge deal
    April 17, 2019
    A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.
  • Norway’s new ‘green’ highway route
    November 13, 2020
    A new route in Norway will provide a faster and greener highway connection between the capital city Oslo and the northern city of Trondheim
  • Philippines mega project for highway and bridge
    May 8, 2017
    Plans in the Philippines are being set out for a highway and bridge mega-project. The proposals call for a 388km highway from Northern Samar to Lucena, Quezon Province. The bridge would span the San Bernardino Strait and connect Allen in Northern Samar Province on Samar Island with Matnog on the Bicol Peninsula in Sorsogon Province. The new highway would also connect capital Manila with Albay, Camarines Sur and Camarines Norte provinces as well as the South Luzon Expressway (SLEx). In all the work could cos
  • North Germany bypass project faces delay
    November 9, 2017
    Construction delays are holding up the opening of a new bypass in northern Germany that will connect the towns of Löhne and Bad Oeynhausen. Construction work on the link commenced in 2008 and has so far cost some €170 million. In all the project is expected to cost €208 million to complete. Although the vast majority of the work has been carried out on the new bypass some finishing works remain to be completed.