Skip to main content

Netherlands: Velsertunnel to be closed for nine months

The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations. Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work. Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supp
April 19, 2016 Read time: 2 mins
The 60-year-old road and rail Velsertunnel in the Netherlands will be closed from now until the end of the year for major renovations.

Improvements to the Velsertunnel beneath the North Sea Canal are scheduled for the road sections only, according to the Rijkswaterstaat, the Dutch government’s Ministry of Infrastructure and the Environment, and the consortium doing the work.

Rijkswaterstaat awarded a design/build/maintain contract in 2014 to Hyacint, a consortium of Besix, Dura Vermeer, and Spie, supported by iNFRANEA. Last year the consortium completed a 3-D BIM model (Building Information Modelling) of the tunnel and of the proposed work to be done. %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit bimontherocks.com website false http://bimontherocks.com/bim-helps-renovate-aging-tunnel/ false false%> for the presentation.

The renovated tunnel will have a 12cm higher clearance profile for trucks, new asphalt and modern technical installations, such as CCTV, fire protection equipment, traffic control systems and ventilation. Escape routes will also be fully updated.

Under the contract, the original and now iconic ventilation towers reaching skyward atop the main ventilation building must remain intact. The unusual-looking towers were listed as a national heritage site in 2014.

Around 65,000 vehicles a day use the tunnel and traffic will be diverted to the Wijkertunnel, a toll tunnel.

The Wijkertunnel is a 21-year old structure that is the first public-private partnership in the Netherlands. Three-quarters of the total €272 million construction cost was put up by a consortium of banks and insurance companies, including ING and Commerzbank. The contract was for 30 years.

Related Content

  • E&E Event 2018 in Berlin: an asphalt industry fit for purpose
    May 15, 2018
    The provisional programme is now available for this year’s Euroasphalt and Eurobitume Event in Berlin. June 14-15. The focus of E&E 2018 will be on the preparations needed by the asphalt industry to ensure that it is fit for purpose in the future. Important strategic issues will be explored, some of which were highlighted in the E&E Congress 2016. These include the increasingly stringent economic aspects of supply and demand, the growing environmental issues over highway construction and use, health
  • Fayat mixes things up at INTERMAT
    January 6, 2017
    Company shows off its new 6-tonne capacity asphalt mixer in Paris, a product aimed at the growing market in recycling and characterised by low energy consumption and high quality output.
  • Fayat mixes things up at INTERMAT
    April 20, 2015
    Company shows off its new 6-tonne capacity asphalt mixer in Paris, a product aimed at the growing market in recycling and characterised by low energy consumption and high quality output.
  • Volvo CE’s earthmovers on film for promotion campaign
    October 25, 2018
    For its new publicity campaign, Volvo Construction Equipment has teamed up with film star hardman Dolph Lundgren to showcase its excavators’ endurance in a stunt-filled mini-movie entitled Pump It Up. In the tongue-in-cheek mini-movie Lundgren, whose credits include Rocky IV, Universal Soldier and The Expendables, plays an all-action drill instructor in an excavator boot camp determined to test the diggers to their limits. Excavators ranging from 1.5t to 95t are ordered to do press-ups, pull-ups, flip