Skip to main content

Netherlands: BBV24 consortium to appeal Blankenburg Tunnel deal

In the Netherlands, the consortium of BBV24 is appealing the awarding of the Blankenburg Tunnel construction contract to another consortium, BAAK Blankenburg-Verbinding. BAAK Blankenburg-Verbinding – consisting of Dutch construction firm Ballast Nedam, Belgian dredging company Deme and Australian investment bank Macquarie – won the contract earlier this year.
September 27, 2017 Read time: 2 mins
In the Netherlands, the consortium of BBV24 is appealing the awarding of the Blankenburg Tunnel construction contract to another consortium, BAAK Blankenburg-Verbinding.


BAAK Blankenburg-Verbinding – consisting of Dutch construction firm 8636 Ballast Nedam, Belgian dredging company 8637 Deme and Australian investment bank 2378 Macquarie – won the contract earlier this year.

The deal is for a tunnel under the Nieuwe Waterweg river west of Vlaardingen, a city in southern Holland and on the north bank of the river Nieuwe Maas where it meets the Oude Maas.

The public-private partnership is worth around €1.2 billion, including design, construction and 20 year’s maintenance. The tender was awarded by Rijkswaterstaat, the Directorate-General for Public Works and Water Management.

Dutch media report that the government documents state the contract was awarded on price, CO2 emissions, traffic disruption and other quality-related criteria. BBV24 – consisting of VolkerWessels, 1355 Boskalis and 7456 BAM - reportedly has asked for clarification of the awarding procedure but has not received answered from the agency.

The project will connect the A20 motorway to the A15 motorway, with site work to start next year. Work includes construction of two junctions and the widening the A20 between the A24 and the Kethelplein junction.

The project is part of the masterplan Rotterdam Vooruit to develop the Rotterdam region between 2020-2040.

For more information on companies in this article

Related Content

  • Philippines: Laguna Expressway and Dike Project fails to get bids
    March 30, 2016
    Construction of a major 47km highway and sea protection dike development in Manila has been thrown into doubt after no bids were received for the US$2.65 billion contract. Philippines media report that the Department of Public Works and Highways declared the auction for the six-lane Laguna Expressway Dike Project a failure after the three pre-qualified bidders didn’t submit bids. The pre-qualified consortia were Trident Infrastructure and Development consortium – consisting of SM Prime Holdings, Megaw
  • Slovakia’s D4/R7 zero bypass of Bratislava picks up award
    February 10, 2017
    Slovakia’s D4/R7 zero bypass of Bratislava has picked up the Best Transaction in Europe award given by the UK magazine Project Finance International. The Ministry of Transport and Construction received the award in London in early February. The ministry said that the contract is notable for being the first whereby a project had combined funding from European Union investment and structural funds and the EU fund for strategic investment. World Highways reported in January that construction will start early
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the