Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • Pattullo Bridge deck near completion
    July 29, 2025
    For several weeks, crews have been installing concrete deck panels, steel girders and stay cables outward from the towers of the bridge that spans the Fraser River near Vancouver, Canada.
  • US funds for road rebuilding
    May 2, 2012
    Some $1.6 billion in funding is being provided from US federal funds to states and territories across the nation to cover the costs of repairing roads and bridges damaged by natural disasters. Funding from the Federal Highway Administration’s (FHWA) Emergency Relief Programme was provided by the Consolidated and Further Continuing Appropriations Act, 2012.
  • US funds for road rebuilding
    March 21, 2012
    Some $1.6 billion in funding is being provided from US federal funds to states and territories across the nation to cover the costs of repairing roads and bridges damaged by natural disasters. Funding from the Federal Highway Administration’s (FHWA) Emergency Relief Programme was provided by the Consolidated and Further Continuing Appropriations Act, 2012.
  • Recycled asphalt cuts costs, maximises performance
    February 10, 2012
    The need to maximise road performance and cut costs has resulted in Indonesian contractors being keen to adopt cold recycling methods