Skip to main content

Nepal's bridge issues

Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened.
February 23, 2012 Read time: 1 min
Structural problems have caused a recently constructed bridge in Nepal to deflect, even before it has been officially opened. The bridge links Eastern Lamjung and Tarkughat and has dropped some 150mm. There is concern that the bridge may collapse, although the local government officials still plan to have the official opening for the 75m long steel truss bridge without further repairs or. The structural issues are likely to have been caused by high water flow rates, which could have affected the formwork in place during the pre-casting process. Bridge scour is a key problem for bridges in Nepal due to the high velocity water flow rates in this mountainous country.

Related Content

  • PERI helping to build world’s longest underwater tunnel
    April 4, 2013
    In China, PERI is playing a crucial role in the construction of the world’s longest underwater tunnel The 6km tunnel is part of a new 35km long road connection across the Pearl River bay in southern China, aiming to allow Hong Kong to grow both physically and economically with Macau and also Zhuhai on mainland China. In a huge field factory near the underwater tunnel site, two production lines are being used to produce a total of 33 tunnel elements. Each of the reinforced concrete tubes for the standard sec
  • England’s new Sunderland Bridge renamed Northern Spire
    December 12, 2017
    The new Sunderland Bridge - on track to open in the spring - was officially named Northern Spire during a recent event on the bridge. The official naming followed a week-long public vote in which 10,000 people chose their favourite name from an official list of three names. Northern Spire received almost half of the votes, according to bridge officials. The other names were Lumen Point (34% of votes) and The Prism which received 17%. The two-span cable-stayed bridge across the River Wear in northeast
  • Sandvik plant increases productivity
    December 3, 2012
    Lafarge Aggregates Malaysia’s Kulai quarry is designed to the highest standards of safety, productivity and efficiency With an emphasis on high standards of safe, efficient and productive operations, Lafarge Aggregates Malaysia recently installed new quarry plant. It became operational earlier this year after Sandvik Mining and Construction Malaysia designed and installed a 250tonnes/hour, four-stage crushing and screening plant in Kulai, Johor, some 270km south of the capital Kuala Lumpur. It is now fully
  • UK traffic offence convictions increase
    May 10, 2018
    Official UK Government figures reveal that convictions for traffic offences in England and Wales have been steadily increasing since 2013. Of concern is that there has been a 52% increase in convictions for dangerous driving in that period. There were guilty verdicts for 1.2 million traffic offences in 2006, according to an analysis of the data by IAM RoadSmart. The number of guilty verdicts for traffic offences then declined for seven years until 2014 when the total number of offences started rising again