Skip to main content

Nepalese road and bridge route

The new steel-truss bridge linking Simikot in Nepal’s Humla district headquarters has now been inaugurated. The road will link Nepal with Hilsa in China and the bridge will span the Karnali River. This bridge will be completed within a year and the Nepalese Government will award the road construction to the Nepalese Army to speed work. The road was started 10 years ago but progress was slow and could not be completed due to insufficient budget. Helicopters will have to be used to carry some of the construct
April 25, 2012 Read time: 1 min
The new steel-truss bridge linking Simikot in Nepal’s Humla district headquarters has now been inaugurated. The road will link Nepal with Hilsa in China and the bridge will span the Karnali River. This bridge will be completed within a year and the Nepalese Government will award the road construction to the Nepalese Army to speed work. The road was started 10 years ago but progress was slow and could not be completed due to insufficient budget. Helicopters will have to be used to carry some of the construction material for the road construction work. This road will help boost trade between the countries and of the 90km route, some 35km has been built so far.

Related Content

  • Italy’s renaissance bridge
    July 21, 2020
    Italian consulting company Italferr created a digital twin for designing the new Genoa bridge and won accolades at Bentley Systems: Bentley Year in Infrastructure Awards
  • Mexico’s new highway for Oaxaca
    May 3, 2023
    Mexico’s Oaxaca State is to benefit from a major new highway link – Mauro Nogarin and Mike Woof report
  • Giving credence for Clearwater revival
    October 29, 2018
    The Minnesota Highway 24 Bridge spanning the Mississippi River at Clearwater is not a major structure. However, it does play a key role as the 376.4m-long bridge links US Highway 10 and Interstate 94. These routes run parallel on opposite sides of the Mississippi River and connect St Cloud to Minneapolis. There was a need to replace the old bridge, built in the 1950s, as it has been designated functionally obsolete, while it featured a restricted maximum load of 36.3tonnes. The price tag to demolish and
  • Messina Strait bridge study complete
    April 6, 2023
    The Messina Strait bridge study has been completed.