Skip to main content

Nepalese road and bridge route

The new steel-truss bridge linking Simikot in Nepal’s Humla district headquarters has now been inaugurated. The road will link Nepal with Hilsa in China and the bridge will span the Karnali River. This bridge will be completed within a year and the Nepalese Government will award the road construction to the Nepalese Army to speed work. The road was started 10 years ago but progress was slow and could not be completed due to insufficient budget. Helicopters will have to be used to carry some of the construct
April 25, 2012 Read time: 1 min
The new steel-truss bridge linking Simikot in Nepal’s Humla district headquarters has now been inaugurated. The road will link Nepal with Hilsa in China and the bridge will span the Karnali River. This bridge will be completed within a year and the Nepalese Government will award the road construction to the Nepalese Army to speed work. The road was started 10 years ago but progress was slow and could not be completed due to insufficient budget. Helicopters will have to be used to carry some of the construction material for the road construction work. This road will help boost trade between the countries and of the 90km route, some 35km has been built so far.

Related Content

  • Chinese loan for Bangladesh
    August 26, 2021
    A Chinese loan will be used for road works in Bangladesh.
  • Paso de las Leña tunnel between Argentina and Chile
    December 22, 2016
    A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region.
  • German highway stretch reopening to be delayed
    February 19, 2019
    Repairs to the A20 highway route in northern Germany are now likely to take longer than initially expected. The route will now take until 2023 to repair, with the work costing some €100 million to carry out and requiring a temporary bridge to carry traffic past the failed section. The temporary bridge accounts for more than half of the cost of the work. The geological problems with the A20 Autobahn route first became visible in September 2018 when a section near Tribsees started to suffer from subsidence.
  • China opens record-breaking bridge
    February 22, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o