Skip to main content

The Nepalese authorities are now addressing structural problems on a series of important bridge links in the country

Major structural problems have been identified in several bridges in Nepal.
March 1, 2012 Read time: 2 mins
Major structural problems have been identified in several bridges in Nepal. Construction work on seven large bridges in Nepal has been halted due to the problems arising in the pier construction.

Work has been stopped on bridges located at Ghurmi and carrying the Udayapur-Okhaldhunga road over the Sunkoshi River and at Khurkot carrying the Sindhuli-Manthali road over the Sunkoshi River. Work has also halted on a bridge in West Nepal carrying the Chnichu-Jajarkot road over the Bheri River, on the Tawa River bridge, the Siwai bridge, the Tadi bridge at Nuwakot and on the bridge over the Junga River at Dhanusa.

A bridge expert in Nepal says that due to geological conditions in Nepal, pier construction faces problems. The expert suggests that bridges with piers should be avoided in the country and that arched structures, though more expensive to build, are more suitable for the country's rugged terrain and would offer long term cost benefits through reduced maintenance needs.

Pier problems at the Bheri Bridge have resulted in it being replaced by a suspension bridge and this has been suggested as another suitable bridge design solution for the country. The issue is endemic, with the country's geology and geography playing a key role. Bridge scour is a serious problem in Nepal, due to the country's mountainous terrain, deep rock valleys and fast flowing rivers. 2664 Nepal's Department of Roads has issue a notice that a further seven bridges are in a serious condition and require repairs.

Bridges requiring repair are at Mugling carrying the Prithvi Highway, the Marsyangdi Bridge carrying the Aanbukhaireni-Gorkha road, the Seti bridge carrying the Khaireni-Bhimad road, the Jharahi bridge carrying the Mahendra highway and the Kaligandaki bridge carrying the Siddhartha highway. The other structures are the Bheri bridge carrying the Ratna highway, the Tamakoshi bridge carrying the Lamosanghu road, the Sunkoshi bridge carrying the Lamosanghu - Jiri road and the Tadi bridge carrying the Pasanglamhu road.

For more information on companies in this article

Related Content

  • EIB aids funding for Poland's A2
    July 12, 2012
    The European Investment Bank (EIB) will help funding of the A2 highway project in Poland, which has faced financing problems due to the economic crisis. The EIB is making an exception to its usual policy by granting to Polish company Autostrada Wielkopolska credit that covers over 50% of the costs of the construction work for a highway section. The EIB will provide €1 billion for the A2 investment and to create an option of an additional €200 million. The total value of the investment, which is expected to
  • Defective eyesight, a road safety concern?
    February 16, 2012
    Failing eyesight presents safety problems for Europe's older drivers. A new report highlights substantial variation in the assessment of drivers' vision across Europe, and recommends that Member States make moves to better assess drivers' vision. Checking the vision of drivers plays a valuable role in the EU's target of halving road deaths across the EU by 2020. The aim is to achieve this road safety improvement by legislative means that change driver behaviour, raise the technical standards of vehicles and
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • Projects planned for Nepalese highway network
    January 9, 2014
    A series of major trade routes are being upgraded in Nepal, which are intended to help boost bilateral trade with neighbouring India and China. This will see four key trade routes being upgraded to six lanes. These are the; Butwal-Belhiya, Rani-Ithari, Surybinayak-Dhulikhel and Birgunj-Pathalaiya highway sections. Work is already underway on the Butwal-Belihiya and Rani-Ithari highway sections while work is also being planned for the Suryabinayak-Dhulikhel and Birgunj-Pathalaiya highways. Of the 24km stretc