Skip to main content

Nepal bridge closes due to defect

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
March 14, 2019 Read time: 1 min
The steel bridge spanning the Bijaypur River in Nepal has had to be closed for repairs

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural
members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting
a temporary structure upstream of the damaged bridge, while a study team has been formed to assess the situation and provide a long term solution.

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Developments in noise-reducing road surfaces
    February 17, 2012
    Mixtures with special additives are being produced for roads, offering noise reduction and aiding recycling. Patrick Smith reports. Noise-reducing road surfacings have been used in motorway construction for some time. But relatively new are noise-optimised surfacings used on roads in towns that do not follow a standard concept.Road trials with these materials have taken place in Germany since 2007 and have been prioritised due to the European Union Guidelines on the Assessment and Management of Environmenta
  • Fast repair for key Cairo road
    July 14, 2015
    Fast repair of Cairo’s busy urban highway has been achieved using paving equipment. And MOBA levelling technology played an important role in ensuring finish quality met requirements. Cairo is Egypt’s fast-growing capital city, with an estimated population of around 20 million living in its catchment area. The city’s fast growth rate however has placed enormous demands on its infrastructure, with transportation creaking under the strain. An increasing numbers of people use the roads in and around Cairo ev
  • Costa Rica highways projects planned
    December 1, 2017
    Costa Rica’s long running San Ramon road project is costing more than originally expected while taking longer to build than planned. The work on the 30km stretch of road was planned initially to cost US$185 million but has so far cost $287.4 million. Meanwhile only around 86% of the project has actually been carried out, despite the work already having been underway for 12 years. Costa Rica’s national road authority, Consejo Nacional de Vialidad (Conavi) is in discussions with contractor Sanchez Carvajal