Skip to main content

Nepal bridge closes due to defect

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
March 14, 2019 Read time: 1 min
The steel bridge spanning the Bijaypur River in Nepal has had to be closed for repairs

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural
members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting
a temporary structure upstream of the damaged bridge, while a study team has been formed to assess the situation and provide a long term solution.

Related Content

  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Australian award
    November 27, 2012
    Two major awards have been given to the Gateway Upgrade Project in Queensland, Australia. One of these was for engineering excellence while the other was the overall RW Hawken Award. These were given as part of the Engineering Australia Awards (Queensland Division) scheme. Following this, the Gateway Project will now be a contender for the national Australian Engineering Excellence Awards being held in November 2012. The Gateway Upgrade is of note as it is one of the largest road and bridge projects ever ca
  • Emergency bridge solution from US for Nepal
    July 21, 2014
    Sophisticated temporary bridge technology has been provided by the US to Nepal to help with emergency access. The US Army Security Assistance Command (USASAC) supplied four prefabricated modular steel bridges, manufactured by Acrow Bridge. These temporary bridges will be used to allow emergency access to disaster hit areas in Nepal. The country’s tough climate and challenging geography mean it is vulnerable to natural disasters such as landslides, avalanches, earthquakes and floods. Acrow is a specialist i