Skip to main content

Nepal bridge closes due to defect

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
March 14, 2019 Read time: 1 min
The steel bridge spanning the Bijaypur River in Nepal has had to be closed for repairs

The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural
members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting
a temporary structure upstream of the damaged bridge, while a study team has been formed to assess the situation and provide a long term solution.

Related Content

  • Underground sight
    September 3, 2012
    Innovative mobile radar technology that can detect subsurface problems is now being launched by surveying specialist Data Collection Limited. The system uses a specially designed vehicle to carry out surveys at normal traffic speeds. Ground-penetrating radar is used to generate a cross-sectional profile of the subsurface. This information can be used to assess road condition, helping with planning repairs and re-surfacing.
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off
  • Manitowoc crane helps construct new Illinois bridge
    December 15, 2017
    A barge-mounted crane from Manitowoc is playing a key role in a major Illinois bridge replacement project. The machine is being used by Kraemer North America, which is replacing an 84-year-old truss bridge near Savanna, Illinois. The firm is employing a barge-mounted MLC300 equipped with the sophisticated variable position counterweight (VPC) technology, which is said to allow the MLC300 to adjust its counterweight during each lift and keep the barge stable while lifting. When Manitowoc introduced its VPC
  • RetroTek: standards are key
    December 12, 2022
    Accurate retroreflectivity measurements of line markings across the full lane width has become even more important after the US adoption of minimum levels of retroreflectivity.