Skip to main content

Moscow-Nizhny Novgorod-Kazan highway project

Planning is underway for the highway connecting Moscow with Kazan, via Nizhny Novgorod. The tendering process will commence in 2020, with construction then expected to commence in either late 2020 or early 2021. A budget for the project has been set by Russia’s state-owned road company, Avtodor. The initial plans called for the highway covering the 742km between Moscow and Kazan to be complete by 2024. However, it now seems likely that the route, which passes Vladimir, Dzherzhinsk, Niznhy Novgorod and Chebo
March 5, 2019 Read time: 1 min

Planning is underway for the highway connecting Moscow with Kazan, via Nizhny Novgorod. The tendering process will commence in 2020, with construction then expected to commence in either late 2020 or early 2021. A budget for the project has been set by Russia’s state-owned road company, 3974 Avtodor. The initial plans called for the highway covering the 742km between Moscow and Kazan to be complete by 2024. However, it now seems likely that the route, which passes Vladimir, Dzherzhinsk, Niznhy Novgorod and Cheboksary before reaching Kazan, will take longer to complete.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • Key Russian highway projects in planning
    November 30, 2015
    Construction of the Russian stretch of the highway connecting Europe with China should be complete by 2018. This section of the project is costing close to US$22.6 billion. The international transit corridor from Europe to Western China is of key economic significance. The first sections of the Russian portion of the route form part of the new high-speed federal highway M-11 from Moscow to St Petersburg. About 40% of the highway will run through the Volga federal district. The 8,400km long international tra
  • Russia planning Kerch Straits bridge project
    September 8, 2014
    The Russian authorities are further developing plans for the new bridge that will span the Kerch Strait. The bridge is now expected to cost some US$6.1 billion to construct and the completion date is expected in 2018. The work will be overseen by the Russian road authority Avtodor. This will be the first bridge crossing of the Kerch Strait since a short-lived structure was erected in the 1940s. The design will have to cope with severe winter weather and the project will be challenging technically.