Skip to main content

Morocco key bypass section complete

Work on the first stretch of the US$55.6 million bypass around Rabat is now complete. The 6km stretch of the N°2 Rabat-Salé route forms part of a wider plan to develop Rabat. The final stretch linking El Oulja with the N°6 national road should be complete in the next few months. The new bypass is intended to reduce the chronic congestion that can occur in the area at peak periods, resulting in far longer travel times for drivers. Morocco’s growing economy has resulted in a parallel growth in vehicle numbers
January 10, 2018 Read time: 1 min

Work on the first stretch of the US$55.6 million bypass around Rabat is now complete. The 6km stretch of the N°2 Rabat-Salé route forms part of a wider plan to develop Rabat. The final stretch linking El Oulja with the N°6 national road should be complete in the next few months. The new bypass is intended to reduce the chronic congestion that can occur in the area at peak periods, resulting in far longer travel times for drivers. Morocco’s growing economy has resulted in a parallel growth in vehicle numbers in the country, increasing traffic congestion right across the country’s key cities.

Related Content

  • A new bridge for Vietnam’s Ho Chi Minh City
    September 23, 2019
    A new bridge project is being planned for Vietnam’s Ho Chi Minh City (HCMC). The Thu Thiem 4 Bridge will be 2.2km in length and measure 28m wide and has a projected cost of US$223 million. The bridge will span the Saigon River and connect District 2 with Tan Thuan Dong in District 7, featuring three lanes for vehicle traffic in either direction as well as pedestrian facilities. The construction of the bridge is expected to ease journey times in HCMC, which is notorious for its heavy traffic and chronic cong
  • New Zealand announces massive infrastructure development programme
    January 30, 2020
    New Zealand’s massive infrastructure development programme has a key focus on transport improvements.
  • Russia plans building city bypasses
    May 18, 2020
    Russia is planning building bypasses around 12 cities.
  • Tunnel construction at Mexican extraction operation
    April 16, 2018
    The innovative Carmix 3500 TC unit is now being put to work at the Concheño underground extraction operation in Mexico This operation in the state of Chihuahua was opened in 2013 and can produce 15000tonnes/day. In this context, Minera Real de Angeles opted for four Carmix 3500 TC machines for the construction of access roads. The machine is said to be both versatile and productive, while its comparatively compact dimensions are well suited to underground use. The unit was supplied to the customer by Car