Skip to main content

Morocco key bypass section complete

Work on the first stretch of the US$55.6 million bypass around Rabat is now complete. The 6km stretch of the N°2 Rabat-Salé route forms part of a wider plan to develop Rabat. The final stretch linking El Oulja with the N°6 national road should be complete in the next few months. The new bypass is intended to reduce the chronic congestion that can occur in the area at peak periods, resulting in far longer travel times for drivers. Morocco’s growing economy has resulted in a parallel growth in vehicle numbers
January 10, 2018 Read time: 1 min

Work on the first stretch of the US$55.6 million bypass around Rabat is now complete. The 6km stretch of the N°2 Rabat-Salé route forms part of a wider plan to develop Rabat. The final stretch linking El Oulja with the N°6 national road should be complete in the next few months. The new bypass is intended to reduce the chronic congestion that can occur in the area at peak periods, resulting in far longer travel times for drivers. Morocco’s growing economy has resulted in a parallel growth in vehicle numbers in the country, increasing traffic congestion right across the country’s key cities.

Related Content

  • From managed asset to service provider: the future highway
    May 20, 2019
    Every day we hear about Mobility as a Service (MaaS), but what about Roads as a Service? Geoff Hadwick reports from the ERF in Brussels The familiar physical asset called the road will increasingly be seen as part of an emerging global services sector. Given that, the role of the road is changing, notes Christophe Nicodème, general director of the European Union Road Federation (ERF). We need to think much more carefully about planning highway infrastructure in terms of people’s needs, said Nicodème,
  • CECE equipment manufacturer’s conference in Berlin looks ahead for construction market growth
    October 29, 2012
    The construction equipment market has been hit hard in Europe and further afield, with economic uncertainty slowing orders. But there is light on the horizon. A range of key industry speakers made presentations at the recent Committee for European Construction Equipment (CECE) congress in Berlin, outlining prospects for the next few years in Europe as well as around the world.
  • New Guatamala City bridge package awarded
    October 14, 2022
    A new Guatamala City bridge package has been awarded.
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment