Skip to main content

Mexico’s Puebla State has road plan under development

Mexico’s Puebla State has a road infrastructure plan under development. In all the work is expected to cost US$612.6 million, with the schedule seeing construction carried out from 2018-2019. The planned works include the La Galarza-Amatitlanes bypass, which will connect Puebla and Morelos. and a distributor road at Periferico Ecologico ring road. Work is being carried out on a 13.5km elevated road forming part of the Puebla to Mexico highway. Plans have been drawn up for upgrades to the road connecting
March 29, 2018 Read time: 1 min

Mexico’s Puebla State has a road infrastructure plan under development. In all the work is expected to cost US$612.6 million, with the schedule seeing construction carried out from 2018-2019. The planned works include the La Galarza-Amatitlanes bypass, which will connect Puebla and Morelos. and a distributor road at Periferico Ecologico ring road. Work is being carried out on a 13.5km elevated road forming part of the Puebla to Mexico highway. Plans have been drawn up for upgrades to the road connecting Tepeaca with Zacatepec and for the road between Tepeaca and Tecamachalco. Puebla’s road development programme has been planned by the Secretariat of Communications and Transport (SCT).

Related Content

  • Indian road projects underway
    April 20, 2023
    Indian road network development projects are underway.
  • Major upgrade planned for key Mexico highway
    October 21, 2015
    A major upgrade of Mexico’s Atizapan-Atlacomulco road link is being planned. The work is expected to commence in 2016 and will cost in the region of US$182.63 million. The project will be carried out by OHL Mexico, the Mexican subsidiary of Spanish form OHL. Once the upgrade is complete, the route will be able to carry heavier traffic volumes than at present and the extra capacity will cut delays on the route, as well as increasing safety.
  • Key Colombia connection construction contract
    January 17, 2018
    Construction work on a new road link connecting Mulalo with Loboguerrero in Colombia will commence in the third quarter of 2018. The 31km link is being handled by Colombia's National Infrastructure Agency (ANI) and is expected to cost US$560.5 million. The plans are being drawn up for the project while the necessary environmental permits are being sought from Colombia’s National Environmental Licensing Agency (ANLA). The new link will be located in Colombia’s Valle del Cauca department.
  • Colombian infrastructure projects boost
    February 22, 2022
    Colombian infrastructure projects will be boosted with new budget.