Skip to main content

Major Chinese highway project commencing

In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.
April 26, 2017 Read time: 1 min
In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.

Related Content

  • Vietnam’s key expressway project
    November 23, 2021
    Vietnam’s North-South Expressway project is key to the country’s future.
  • China plans important construction machinery show in Changsa for May 2019
    January 8, 2019
    An important construction machinery exhibition for the global equipment market is being planned for the Chinese city of Changsha in May 2019.
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.
  • Lane Construction to carry out Florida highway deal
    November 24, 2017
    Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco